
News
Complimentary VORTX Placement Schedule
PLP have the latest software available to give accurate placements that will optimise damper performance and save valuable line hardware and support structures. Incorrect placement and/or quantity of dampers per span will be ineffective in providing line protection, which is why PLP are offering this comprehensive service. The sophisticated software allows for the input of all types of terrain, climatic and other variables, allowing the PLP technical support team to offer you solutions aimed at minimising the damaging effects of Aeolian vibration.
Damper Placement
The recommended number of dampers per span depends on the amount of wind energy exposure and the conductor/cable characteristics. Self dampening is a conductor characteristic attributed to component material and construction. For example the individual strands that make up a conductor can move relative to one another and dissipate energy - much the same way that the messenger does in the damper. Increasing line tension however, will decrease self dampening as the individual strands begin to lock together. Diverse conductor types have specific performance characteristics that require strategic planning and damper placement on the line to counter potential damage to the system.
Line Details
The degree of protection required on a specific line depends upon a number of factors such as line design, local climate, tension, exposure to wind flow, and line vibration history in the area. With assistance from PLP, the necessary information can be assembled for review and followed up with detailed PLP recommendations for your system.
Contact PLP for your complimentary placement schedule on:
Ph: (02) 8805 0000
Email: plpsales @ preformed. com. au

News Archive
- 27 September 2007Complimentary VORTX Placement Schedule
- 24 September 2007Major Supplier of Busbar Systems to Australian Market
- 10 August 2007PLP Corona Analysis Service
- 23 April 2007Preformed Line Products acquires Belos S.A.
- 30 July 2005Turning the First Soil
- 20 July 2005SSD Field Trial
- 6 July 2005Safety Service Disconector
- 5 July 2005Energy Australia Recognition
- 1 July 2005PLP wins Aurora Supplier of the Year
- 29 July 2004PLP Embraces Accelerated Product Development
- 19 July 2004Turnkey Substation Anchors
- 6 July 2004Fibre to the Home
- 4 July 2004PLP's New Operation in Asia
- 21 October 2002Dedicated Queensland Sales Office in Brisbane
- 10 October 2002PLP Wins Export Award AEEMA
- 7 September 2002Country Energy says Thanks
- 3 September 2002PLP Awarded for Excellence
- 23 August 2002PLP Celebrate 40 Years
- 7 August 2002Mobile Training with PLP
- 26 December 2001PLP 100% Australian
- 25 December 2001D2001 Exhibition
- 20 August 2001PLP Re-Invest in Australian Manufacturing
- 15 August 2001Molong Substation
- 4 August 2001PLP a growing success in Asia
- 18 November 1999PLP's KGK Lasco drop forge hammer
- 12 November 1999Advance Energy and PLP
- 6 July 1999Pro-Engineer Proves its worth
- 2 July 1999New Product- ABC Service Terminations
- 1 July 1999PLP Enters the Data Communications Market